(KNSI) – Road work on a heavily used route in Sartell will cause a few bumps for drivers this week.
Paving on Riverside Avenue/County Road 1 starts Thursday, June 15th and will go until Friday, June 16th. Drivers are strongly urged to find alternate routes to minimize delays. Crews will put down the final pavement layer from Sartell Street to 12th Street North.
The road will be open but with some temporary closures on side streets, including 4th, 5th, 6th, 8th, 10th and 11th Streets.
___
Copyright 2023 Leighton Enterprises, Inc. All rights reserved. This material may not be broadcast, published, redistributed, or rewritten, in any way without consent.
Trump appoints longtime foreign policy adviser Richard Grenell to serve as special missions envoy
President-elect Donald Trump has picked longtime foreign policy adviser Richard Grenell to serve as an envoy for special missions
52m ago
Colorado two-way star Travis Hunter wins the Heisman Trophy as the most outstanding player in college football
Colorado two-way star Travis Hunter wins the Heisman Trophy as the most outstanding player in college football
52m ago