×

(KNSI) – The City of St. Cloud begins road maintenance on Monday on over four dozen streets.

While crews are hard at work, you can expect lane shifts or flag control to help drivers navigate through a single open lane. Minor traffic delays are possible, and drivers should slow down as they head through work zones. Road maintenance includes anything from pothole patching to resurfacing.

A list of all of the projects and a map are included below.

1. 60th St S
2. 250th St S
3. 255th St S
4. 40th St S
5. 36th St S
6. 17th Ave S
7. Southwood Tr
8. Southway Dr
9. Kuhn Dr
10. Suncrest Dr
11. Sunridge Dr
12. Sportsman Island Rd
13. Oak Grove Rd
14. Maine Prairie Rd
15. 25th Ave S
16. Cooper Ave S
17. Traverse Rd
18. 16th St S
19. University Dr
20. Washington Mem Dr
21. West St Germain St (W)
22. West St Germain St (E)
23. 11th Ave N
24. Minnesota Blvd SE
25. TH 301
26. University Dr SE
27. 7th St SE
28. 15th Ave SE
29. Wilson Ave
30. Riverside Dr NE
31. 25th Ave N
32. 3rd St N
33. 7th St N
34. 9th St N
35. 10th St N
36. 11th St N
37. 32nd Ave N
38. 31st Ave N
39. 30th Ave N
40. 7th Ave N
41. Stearns Way
42. Stockinger Dr
43. Park Dr
44. McLeland Rd
45. Anderson Ave
46. Foundry Cir
47. Saukview Dr
48. Cypress Rd
49. Westwood Pkwy

 

 

___

Copyright 2025 Leighton Media. All rights reserved. This material may not be broadcast, published, redistributed, or rewritten, in any way without consent.

FOLLOW US FOR INSTANT UPDATES!

FOLLOW US FOR INSTANT UPDATES!

KNSI on Twitter

No feed items available at this time.