News

Jay Cooke's swinging bridge due back

Jay Cooke's swinging bridge due back Click to Enlarge Photo:

Apr 6, 2013 at 6:06 am

ST. PAUL, Minn. (AP) - A replacement for the historic swinging bridge at Jay  Cooke State Park should be in place just in time for the fall color season.

The pedestrian bridge was destroyed by the sudden flooding that racked the  Duluth area and northern Minnesota last June. It was the second time the bridge, built in the early 1920s, was wiped out by high water on the St. Louis River.

Department of Natural Resources spokeswoman Cheri Zeppelin says construction is expected to start in May and finish between late August and late September.

The rebuilt bridge will be more historically accurate, replacing metal hand rails installed in 1950 with log rails and stiles that were a feature of the 1934 bridge.

The cost is being covered by $1.5 million in federal disaster aid.

JW Cox

Posted By JW Cox

Staff Writer

JW Cox's Profile

Leave a Comment

Current Weather

For Central Minnesota

Temp: 32°F (0°C)

Dewpoint: 24

Wind: 10 N

Weather: Cloudy

Full Forecast | Live Radar

Community Calendar